18 Dec 2018
First stones
February 2018
Piles and site board
March 2018
Preparation of piles
March 2018
Installation of experimentation floor
April 2018
First floor installation
April 2018
First floor installation
April 2018
First floor installation
April 2018
Surrounding area of the Roger Ben Aïm Test Center
April 2018
Floor slab casted
April 2018
Aerial view of the construction site
April 2018
Aerial view of the construction site
April 2018
Aerial view of the construction site
April 2018
Aerial view of the construction site
April 2018
Rooftop installed
June 2018
Rooftop installed
June 2018
Front facing cladding
September 2018
Side view of laid siding
September 2018
View from roof terrace to drinking water
September 2018
View from roof to waste water
September 2018
Canal side view
September 2018
Guardrail roof terrace pose front view
October 2018
Guardrail roof terrace pose side view
October 2018
Decanted water
December 2018