THE CONSTRUCTION WORK PROGRESSES

by Vincent EDERY | 18 Dec 2018 | The construction site

Networks

February 2017

Earthwork

January 2018

Earthwork

January 2018

Foundations

February 2018

First stones

February 2018

Piles and site board

March 2018

Piles

March 2018

Preparation of piles

March 2018

Installation of experimentation floor

April 2018

First floor installation

April 2018

First floor installation

April 2018

First floor installation

April 2018

Surrounding area of the Roger Ben Aïm Test Center

April 2018

Floor slab casted

April 2018

Aerial view of the construction site

April 2018

Aerial view of the construction site

April 2018

Aerial view of the construction site

April 2018

Aerial view of the construction site

April 2018

Rooftop installed

June 2018

Rooftop installed

June 2018

Front facing cladding

September 2018

Side view of laid siding

September 2018

View from roof terrace to drinking water

September 2018

View from roof to waste water

September 2018

Canal side view

September 2018

Guardrail roof terrace pose front view

October 2018

Guardrail roof terrace pose side view

October 2018

Decanted water

December 2018